Thaw frozen ground.
Keep working.

In stock available for instant rapid shipping

Industrial infrared ground thaw mats with rapid job-site delivery across the USA & Canada.

DIG Ready Industrial Ground Thaw Mats are built for contractors who cannot afford winter downtime. Using high-output infrared heat, DIG Ready thaws frozen ground evenly and reliably in 36 to 60 hours, leaving soil dry, stable, and ready to work.

Fast response. Real answers.

Get a Delivery Quote Today

Job Intake
Name
Name
First Name
Last Name

What Dig Ready is

Industrial Infrared Ground Thaw Mats

DIG Ready is not a boiler system. It is not a residential electric blanket.
Each mat contains a 16-layer FAR infrared heating element that converts 100 percent of electricity into heat, delivering even 170-degree surface heat directly into frozen ground.

No hoses.

No glycol. No pumps. No leaks to worry about.

No fluids.

All-electric. Plug and go. Maximum uptime.

No moving parts.

Industrial durability. Minimal maintenance.

"Lay it down. Plug it in. Let it work."

Zero learning curve. Zero special training required.

What it does on your job site

This is built for real job sites, harsh climates, and continuous winter use.

Fast Delivery to Active Job Sites

USA & Canada | Express Options Available

Waiting for equipment costs more than the equipment itself.
DIG Ready ships from multiple regional warehouses across North America,
allowing us to deliver mats directly to active job sites, including remote locations.

Regional hubs

Multiple distribution points for faster delivery times.

Job site direct

Ship straight to your active construction location.

Express available

Need it tomorrow? We offer expedited shipping options.

Job site direct

Ship straight to your active construction location.

Why Contractors Switch to

DIG Ready

Compared to Hydronic Systems

Compared to Standard Electric Thaw Blankets

How it Works

No special training required.

01

Lay mats directly on frozen ground

02

Connect using waterproof connectors

03

Infrared heat penetrates
evenly into soil

04

Ground thaws dry and ready for work

Real Job-site Footage

These videos are recorded by crews using DIG Ready on active job sites.
They are not staged or polished.
They show exactly what the mats do in real winter conditions.

Foundation excavation – Minnesota

Utility trench – Alberta

Commercial site prep – Montana

Who uses DIG Ready

Excavation and trenching contractors

Construction and concrete crews

Utility and infrastructure projects

Electrical grid installations

Oilfield and mining operations

Drilling and exploration teams

Septic installers

Solar power contractors

If frozen ground costs you time or money, DIG Ready is built for you.

What Contractors Say

I used to lose half the year to winter. Now I work year-round.

It's not just a thaw mat. It pays for itself.

I stop breaking equipment and start finishing jobs.

Common questions

Straight talk. No runaround.

We offer express delivery from regional warehouses across the USA and Canada. Many job sites receive mats in days.

We offer express delivery from regional warehouses across the USA and Canada. Many job sites receive mats in days.

We offer express delivery from regional warehouses across the USA and Canada. Many job sites receive mats in days.

We offer express delivery from regional warehouses across the USA and Canada. Many job sites receive mats in days.

Still have questions?

Stop Losing Time to Frozen Ground

Every winter delay costs labor, equipment time, and revenue.
DIG Ready helps you stay on schedule when others are forced to wait.